• eded8730c68912c0b196d342ebcee3dc.jpeg

    eded8730c68912c0b196d342ebcee3dc.jpeg

  • e9cac6d0dff9c70eb9974e3b27ebcff8.jpeg

    e9cac6d0dff9c70eb9974e3b27ebcff8.jpeg

  • 9a5575ae29500430c3945966107b415b.jpeg

    9a5575ae29500430c3945966107b415b.jpeg

  • 904e09140d23bc80a16c5e1a3583f151.jpeg

    904e09140d23bc80a16c5e1a3583f151.jpeg

  • 17a3c62c4570a7eaf1873795dc58c247.jpeg

    17a3c62c4570a7eaf1873795dc58c247.jpeg

  • 21b2a944e7b6680e829e58a541826b3f.jpeg

    21b2a944e7b6680e829e58a541826b3f.jpeg

  • bea82af44daa6efe66392e7f00c365fb.jpeg

    bea82af44daa6efe66392e7f00c365fb.jpeg

  • 50b246fb4bd188308d5c3c3e7a2c2a15.jpeg

    50b246fb4bd188308d5c3c3e7a2c2a15.jpeg

  • 9d9dffcba61f9970ba4aea78565c9441.jpeg

    9d9dffcba61f9970ba4aea78565c9441.jpeg

  • c1ce605aeb83e123d0ae7f5fcdd230ad.jpeg

    c1ce605aeb83e123d0ae7f5fcdd230ad.jpeg

  • 707b58a1cc25e94fb0944afec724275e.jpeg

    707b58a1cc25e94fb0944afec724275e.jpeg

  • e94a67e901f979b42d5c2fbb427b00e5.jpeg

    e94a67e901f979b42d5c2fbb427b00e5.jpeg

  • 99f3f69b3c1e18255969b60f46817b1e.jpeg

    99f3f69b3c1e18255969b60f46817b1e.jpeg

  • d636d84758e07cc0a6f3ad47c428bc13.jpeg

    d636d84758e07cc0a6f3ad47c428bc13.jpeg

  • bd95a04657f410f10fae6df416c556fe.jpeg

    bd95a04657f410f10fae6df416c556fe.jpeg

  • e7b6c2a59c0014a83a2fcd4cdd69f54f.jpeg

    e7b6c2a59c0014a83a2fcd4cdd69f54f.jpeg

  • 12c08e411699bf5dae9b3a688cdfa03f.jpeg

    12c08e411699bf5dae9b3a688cdfa03f.jpeg

  • d84492eb5d00afe371cbf52d2605ceb7.jpeg

    d84492eb5d00afe371cbf52d2605ceb7.jpeg

  • 3a4cdbd63844a625118730f31d63b86c.jpeg

    3a4cdbd63844a625118730f31d63b86c.jpeg

  • 870d3e58a2bf59e3f6af5b87378994c0.jpeg

    870d3e58a2bf59e3f6af5b87378994c0.jpeg

Thelma Chalifoux School

Thelma Chalifoux School is a fresh addition to the Meadows community in Edmonton. The grades 7-9 school has a capacity of 900 students and was designed with 21st Century learning concepts. Several workshops, seminars and Big Room meetings were held by the Integrated Project Delivery (IPD) team to establish a design that met the needs of Edmonton Public Schools in a new collaborative way. The IPD process allowed for better planning, scheduling, collaboration and creativity.

The school is arranged into groups of classrooms called learning communities; creating more opportunities for collaboration and connection amongst students and teachers. Each community features an array of learning environments from breakout rooms and quiet study spaces to larger open areas filled with flexible furniture that can accommodate a range of activities. The school also contains a culinary-grade teaching kitchen, performing arts room and a flexible makerspace complete with an outdoor project patio.

The building exterior is wrapped in a subtle, undulating vertical pattern of white, grey and greens; reminiscent of nearby fields. Charcoal grey brick balances the lightness of the composite metal panels and anchors the school to its site.

Environmentally friendly design strategies and building materials were central to the project design solution, which is targeting LEED® Silver certification from the Canadian Green Building Council. Extensive daylighting strategies and features such as radiant in-floor heating also serve to benefit the well-being of students and teachers. Solar panels are integrated into the final design in order to optimize the energy return to the Edmonton power grid.

 

IPD Core Team: Edmonton Public Schools (owner), Delnor Construction (contractor), ACI Architects & Number TEN Architectural Group (architects)

IPD Team Members

Number TEN’s Role: Lead Planning and Design Architects
Size: 89,640 sq. ft.
Completion: Spring 2020 
Location: Edmonton, AB

axo thelma double